Resin floors are sensitive to temperature, humidity and condensation while they cure. Keep the substrate and air within the MDS range, and keep the substrate at least 3 °C above the dew point during application and early cure.
Why conditions matter
Resins cure by chemical reaction, and that reaction depends on temperature. Too cold and the floor cures slowly or incompletely. Too hot and working time shortens sharply. High humidity and condensation can leave a greasy film on epoxies, known as amine blush, which spoils gloss and the bond of the next coat.
The dew point rule
The dew point is the temperature at which moisture in the air condenses onto a surface. If the slab is at or near it, a film of water forms that you may not see. The widely used safety margin is to keep the substrate at least 3 °C above the dew point.
Key checks
| Parameter | Typical requirement | How to measure |
|---|---|---|
| Substrate temperature | Within the MDS range, often around 10 to 30 °C | Infrared or contact thermometer |
| Air temperature | Within the MDS range | Thermometer |
| Air relative humidity | Below the MDS limit, often around 80 to 85% | Hygrometer |
| Dew point margin | Substrate at least 3 °C above dew point | Dew point meter or calculator |
| Temperature trend | Stable or falling preferred | Log readings through the day |
Method overview
- Measure before mixing. Record substrate temperature, air temperature, humidity and dew point.
- Condition the space. Heat and dehumidify where needed, using indirect or electric heating.
- Store materials correctly. Keep components at the temperature the MDS recommends.
- Watch rising temperatures. A warming slab releases air through pores, causing pinholes. Applying as temperatures fall reduces this.
- Hold conditions through cure. Maintain the range until the MDS cure time has passed.
- Ventilate. Provide fresh air without creating draughts or dust.
Common failure modes
| Symptom | Likely cause | Prevention |
|---|---|---|
| Sticky or greasy surface | Amine blush from cold or humid conditions | Control conditions; follow MDS recoat advice |
| Pinholes or bubbles | Outgassing as slab temperature rises | Apply on falling temperatures; seal porous substrates |
| Slow or soft cure | Too cold | Heat the space and substrate |
| Lap marks, short working time | Too hot | Work in cooler periods; smaller mixes |
| Water marks or dull patches | Condensation | Keep 3 °C above dew point |
Every floor application is unique and needs a bespoke approach. This information is general technical guidance and does not replace a site assessment or the product’s MDS. Always confirm suitability with our certified professionals before specifying or installing.