- Every installation follows the same basic order.
- Most of the work happens before the first coat goes down.
- The floor needs time to cure before full use.
Step by step
A typical installation follows these steps:
- Site assessment and quotation: the floor is inspected and the system is chosen.
- Preparing the site: the area is cleared, protected and brought to the right temperature.
- Surface preparation: the floor is ground or shot blasted and vacuumed.
- Repairs: cracks, holes and joints are treated.
- Primer coat: seals the base and creates the bond.
- Main coat: builds the thickness, strength and colour.
- Top coat (sealant): protects the floor and sets the final finish.
- Curing and handover: the floor is left to cure, then handed over with a care guide.
How long does it take?
Most projects take a few days from preparation to the final coat, depending on the size of the area, the system and the conditions on site. Light foot traffic is usually possible soon after the final coat, with full use a little later. Your applicator will give you a programme for your project.
During the installation
Keep the area closed to other trades and foot traffic, and keep the temperature stable. Avoid placing furniture or loads on the floor until your applicator confirms it is ready.
- Pot life: how long mixed product stays workable.
- Recoat time: how long to wait before the next coat.
- Full cure: when the floor reaches its full strength.
Every floor application is unique and needs a bespoke approach. This guide gives general information only. We recommend consulting our certified professionals for advice on your specific project.